01SurveyWalk the building
A site survey with the GC, the engineer or the owner: pathways, ceiling access, existing systems, and what has to stay live.
02Takeoff · scopeCount it and price it
Takeoff from the drawings: drops, devices, points, panels and conduit. A clear scope, with the exclusions written down.
03Riser · point listSubmittals
Installation drawings, riser diagrams, point lists and device data sheets, approved before installation starts.
04Pathways · pullRough-in
Sleeves, J-hooks, tray, backboxes and conduit, then cable pulled, dressed and supported.
05TerminationsTerminate & label
Panels landed, jacks and patch panels terminated, every cable labeled at both ends.
06Test resultsTest & certify
Every drop tested and recorded. Every point checked end to end, from the device to the graphic.
07Sequences · CxProgram & commission
Sequences, graphics, schedules and alarms, then functional tests with the engineer.
08As-builts · trainingHand over & service
As-builts, training for the people who will run it, and service after the punch list is closed.